Key Achievements
Project time and budget savings: our team saved the client 21 days on the program, resulting in direct cost savings, through the development of alternative designs.
Productivity: The project achieved an incredible production rate of 800m of road track per day.
Safety, Health and Environmental performance – The safety, health, and environmental performance throughout this project was exceptional, with no incidents or accidents. The Lost Time Injury Frequency Rate (LTIFR) was zero, with over 15,100 Man-hours Worked.
Traffic Management – traffic flow on the Calder Highway intersection with Castle Crossing Road was maintained under traffic control arrangement permit and at key internal access points during works, through the implementation of stringent traffic control.
Productivity: Even during extreme heat, works continued and was optimised through clever programming and innovative on and off-site watering processes.